65-inch mount and cable concealment, 4-room flat in Bedok
A 65-inch screen mounted on a feature wall with every cable taken inside it, so nothing hangs below the panel.
- Floor area
- 990 sqft
- Location
- Bedok
- Completed
- 2 Sept 2026
Real properties, real scopes. Browse the reinstatements, strip-outs, ceilings and repaints we have handed over.
Proof of work
Photos, scope, floor area and duration are recorded when the job finishes, so what you see here is the work as it was delivered.
ASN Engineering projects
Filter by property type or location to see the jobs closest to yours.
A 65-inch screen mounted on a feature wall with every cable taken inside it, so nothing hangs below the panel.
A wardrobe run built in a room too tight to lay the frames flat, anchored properly and the packaging taken away.
A tired mortice lock swapped for a digital one, with the door edge made good so the new plate sat flat.
HDBA wet patch spreading across a bedroom wall, traced before anything was opened up, then repaired and made good.
Five windows fitted with double tracks so the sheer and the night curtain run independently.
LandedPerimeter and entry coverage set out on a walk of the property, cabled without opening a single finished wall.
RetailAn intermittent trip that had closed the unit twice, traced to a soaked exterior fitting and repaired the same night.
A flat roof that held water after every storm, taken back to the slab and relaid so it drains.
An occupied flat repainted room by room, with the preparation that stops old repairs reappearing by the second year.
Four displays hung on partition walls that could not take them, using backing plates set into the studs.
An overloaded board on a single earth leakage unit, replaced and split so one fault no longer takes the whole flat dark.
A full floor of desks, chairs and storage assembled over a weekend so the team walked into a finished office on Monday.
Entry, server room and stores covered on one system, cabled into the existing rack during the fit-out.
Every wall in the flat skimmed flat after a rewire, so the repaint went on without a single patch outline showing.
Failed exterior paint taken back to sound substrate, sealed and recoated so the next repaint is years away, not months.
Two bedrooms taken properly dark, with backing plates fitted where the wall would not hold the load.
Two dated bathrooms refitted with new sanitary ware across a weekend, water back on in the unit each evening.
A balcony door that took two hands to move, fixed at the rollers rather than replaced.
Furniture taken apart at one address and rebuilt at the next, with the fittings kept with the piece they belong to.
Two bathrooms redone properly after the unit below started staining, with a flood test before a single tile went back.
A wall that had been repainted twice in three years, taken back to sound material and rebuilt properly.
A tired office rewired around a new desk layout, with lighting set out to the desks rather than to the old grid.
A rented flat covered in a day with no chasing and nothing that cannot be taken down at the end of the lease.
Screen and console taken down for a repaint and put back afterwards, with the old fixing holes made good properly.
New blockwork plastered and levelled across an industrial unit, handed over flat and ready for the coating system.
A whole west-facing floor blinded out over a weekend, so nobody worked around a ladder.
RetailA café kitchen re-piped for a new equipment layout, tested and signed off before the counters went back in.
A balcony whose coating had let go at the cracks, taken up and relaid so the wall below stayed dry.
Only the parts the lease named: three meeting rooms and a pantry taken out, the rest of the floor left as it stood.
A whole-floor strip of a dated office fit-out, taken back to bare structure so the incoming tenant could start from a clean slab.
RetailA trading shop repainted across three overnight shifts, open to customers every morning as normal.
A cracked shopfront door and a shutter lock that had seized, both put right in one visit.
Chasing new circuits and pipe runs into existing walls under an HDB permit, then making every opening good and paint-ready.
A whole floor returned to bare handover condition inside a three-week lease tail, working nights around the building's access hours.
A live-mall strip-out run inside a five-night permit window, with hoarding, dust screening and every load carted through the service lift.
A mall unit handed back as bare shell between two tenancies, run inside the centre's overnight works window.
An open floor split into four offices and a meeting room, with a new ceiling and lighting layout set out around the existing air-con.
A glazed meeting room built into the corner of a showroom, with an L-box ceiling and concealed lighting over the table.
New cove ceilings and lighting through the living and dining areas, with a full skim and repaint so no patch lines show.