Wall Hacking and Make-Good in Sengkang

Chasing new circuits and pipe runs into existing walls under an HDB permit, then making every opening good and paint-ready.

Ceiling and wall opened up during hacking works

The rewire and the new kitchen plumbing both needed routes through existing walls, which in an HDB flat means an approved permit and a hard stop on anything structural.

We confirmed which walls could be touched, submitted the permit, and chased the channels for the new circuits and pipework. Nothing load-bearing was cut.

Once the trades had first-fixed, the openings were filled, skimmed flush and left paint-ready, so there is no map of patches showing through the finished walls.