Two dated bathrooms refitted with new sanitary ware across a weekend, water back on in the unit each evening.

Both bathrooms still had their original fittings — a dripping mixer, a cistern that ran on, and basins the owner had stopped trying to clean.
Old sanitary ware came out, the connections were checked and brought up to the new fittings rather than adapted with a stack of reducers, and everything was set and sealed properly.
The job was planned so the unit was not left without water overnight: one bathroom a day, both usable by the evening, and everything run and leak-checked before we closed up.
RetailA café kitchen re-piped for a new equipment layout, tested and signed off before the counters went back in.
HDBA wet patch spreading across a bedroom wall, traced before anything was opened up, then repaired and made good.
HDBTwo bathrooms redone properly after the unit below started staining, with a flood test before a single tile went back.