A tired office rewired around a new desk layout, with lighting set out to the desks rather than to the old grid.
- Floor area
- 3,200 sqft
- Location
- Jurong
- Completed
- 27 Apr 2026
An overloaded board on a single earth leakage unit, replaced and split so one fault no longer takes the whole flat dark.

The flat tripped completely whenever the kitchen and the water heater ran together, and everything sat behind one earth leakage unit — so every trip took the lights out with it.
We replaced the board, split the load across separate circuits with their own protection, and gave the kitchen and heater their own ways. Existing wiring was checked as we went; two junctions that had been made off outside an enclosure were remade properly.
Every circuit was tested and the results recorded, and the schedule was left inside the board cover where the next person will find it.
OfficeA tired office rewired around a new desk layout, with lighting set out to the desks rather than to the old grid.
RetailAn intermittent trip that had closed the unit twice, traced to a soaked exterior fitting and repaired the same night.
HDBEvery wall in the flat skimmed flat after a rewire, so the repaint went on without a single patch outline showing.