New blockwork plastered and levelled across an industrial unit, handed over flat and ready for the coating system.

New internal blockwork had gone up across the unit and needed a durable finish that would take a hard-wearing coating rather than a domestic emulsion.
Walls were cement-plastered, and the areas the previous contractor had left out of true were levelled rather than skimmed over — a wave under a gloss coating in a lit warehouse shows from the other end of the floor.
Work was sequenced around the M&E first fix so nothing had to be reopened, and the unit was handed over clean and paint-ready to the client's coating contractor.
HDBEvery wall in the flat skimmed flat after a rewire, so the repaint went on without a single patch outline showing.
CondominiumA wall that had been repainted twice in three years, taken back to sound material and rebuilt properly.
OfficeOnly the parts the lease named: three meeting rooms and a pantry taken out, the rest of the floor left as it stood.