HDBWhole-unit repaint, 4-room flat in Punggol
An occupied flat repainted room by room, with the preparation that stops old repairs reappearing by the second year.
- Floor area
- 990 sqft
- Location
- Punggol
- Completed
- 25 Jul 2026
A trading shop repainted across three overnight shifts, open to customers every morning as normal.

The unit could not close, so the whole job was built around mall access hours: in after closing, out and fully reset before the shutters went up.
Fittings and stock were sheeted each night and uncovered each morning. Scuffed and damaged areas were made good and spot-primed before the finish coats, and a low-odour system was specified so the space was usable at opening.
Three shifts, no lost trading day, and the touch-up walk done with the store manager on the last morning.
HDBAn occupied flat repainted room by room, with the preparation that stops old repairs reappearing by the second year.
LandedFailed exterior paint taken back to sound substrate, sealed and recoated so the next repaint is years away, not months.
OfficeA whole floor returned to bare handover condition inside a three-week lease tail, working nights around the building's access hours.